01
ingest.grade_target
✓ SUCCEEDED
0.8 s
Mill Orchestrator — Pulled the 110 gsm testliner spec, customer tolerances and the standing energy budget from mill MES; locked the target envelope for the run.
-
02
twin.simulate
✓ SUCCEEDED
34 s
Mill Orchestrator — Simulated 48 candidate transition recipes on the as-run paper-machine twin — forming, press, dryer and calender — and ranked them on off-spec tonnes, break risk and steam.
-
03
stock.refine
✓ SUCCEEDED
2 m 10 s
Pulp-and-Stock — Stepped refiner specific edge load 1.9 → 1.4 Ws/m and pushed freeness toward 412 CSF while consistency held at 3.4%.
-
04
wetend.dose
✓ SUCCEEDED
1 m 26 s
Wetend-and-Chemistry — Retention aid trimmed to 214 g/t and sizing to 1.1 kg/t against live charge and turbidity; first-pass retention recovered to 78% inside 90 seconds.
-
05
form.headbox
✓ SUCCEEDED
1 m 05 s
Form-and-Press — Re-cut the slice profile across 78 actuators and set jet-to-wire to 0.994 to hold formation index through the basis-weight ramp.
-
06
press.nip
✓ SUCCEEDED
48 s
Form-and-Press — Nip load reduced 620 → 540 kN/m to protect the lighter web; post-press dryness landed at 47.1%.
-
07
dry.steam
✓ SUCCEEDED
3 m 18 s
Dry-and-Coat — Re-phased the steam schedule across 6 dryer groups and rebalanced the hood; reel moisture converged to 7.4% ±0.19 2σ at 6.1% less steam than the standing recipe.
-
08
inspect.web
✓ SUCCEEDED
continuous
Defect-and-Inspect — 18 line-scan cameras streaming; two edge-crack precursors detected at the drive side and cleared by a 40 kN/m nip trim before either propagated.
-
09
approve.human
◆ APPROVAL
52 s
Mill Orchestrator — Speed ramp 1,180 → 1,245 m/min exceeded the site autonomy threshold. Held for the machine tender; approved by J. Okonkwo at 04:57:12.
-
10
reel.qualify
✓ SUCCEEDED
1 m 31 s
Quality-and-Conformance — Reel R-24188 released: full genealogy written (furnish, chemistry, CD profiles, defect map, operator actions) and checked against grade spec.