Nordkraft Mills
PM4, 400,000 t/yr kraftliner and testliner. Started on break prediction after a quarter with 14 breaks a month; now runs bounded autonomy on stock, chemistry and drying.
Every mill on this page had the same problem in a different order: a retiring paper-maker, an energy target, a break rate nobody could explain, or a customer complaint they could not trace. All names and figures on this page are design-partner engagements [ASPIRATIONAL — pre-launch].
Live example: Grade change PM4 · 135 gsm kraftliner → 110 gsm testliner, no break, ≤14 min off-spec
Design-partner mills
Design-partner mills and named references [ASPIRATIONAL — pre-launch].
Each began with a single machine and a single number.
PM4, 400,000 t/yr kraftliner and testliner. Started on break prediction after a quarter with 14 breaks a month; now runs bounded autonomy on stock, chemistry and drying.
Folding boxboard with a severe grade-change waste problem across 11 transitions a week. Twin-rehearsed sequencing cut off-spec tonnage by 22%.
Coated woodfree with customer claims on gloss and caliper variation. CD profile control took first-pass quality from 91.4% to 96.8%.
Two tissue machines under a hard energy target. Yankee and hood optimisation delivered 7.9% less steam per tonne without touching crepe structure.
Highly variable recovered fibre furnish. Pulp-and-Stock holds freeness inside ±4 CSF across OCC quality swings.
Specialty grades with food-contact traceability requirements. Reel genealogy turned release documentation from a shift job into a query.
Autonomy earns trust one shift at a time. These are design-partner quotes from pilot deployments [ASPIRATIONAL].
"The first thing that convinced the crew wasn't the control — it was the log. You can scroll back and see exactly why it dropped the nip. Nobody argues with a timestamp."
Machine tender · PM4 · Nordkraft Mills
"We had two people who could do a clean 135-to-110 transition. One retired in March. The twin now does the sequencing and the second one supervises it."
Production manager · Aurora Board
"Break prediction was the wedge. Ninety seconds of warning is the difference between a nip trim and four hours of threading."
Process engineer · Ternvik Paper
This is the Nordkraft PM4 transition that the case study is built on.
Mill Orchestrator — Pulled the 110 gsm testliner spec, customer tolerances and the standing energy budget from mill MES; locked the target envelope for the run.
Mill Orchestrator — Simulated 48 candidate transition recipes on the as-run paper-machine twin — forming, press, dryer and calender — and ranked them on off-spec tonnes, break risk and steam.
Pulp-and-Stock — Stepped refiner specific edge load 1.9 → 1.4 Ws/m and pushed freeness toward 412 CSF while consistency held at 3.4%.
Wetend-and-Chemistry — Retention aid trimmed to 214 g/t and sizing to 1.1 kg/t against live charge and turbidity; first-pass retention recovered to 78% inside 90 seconds.
Form-and-Press — Re-cut the slice profile across 78 actuators and set jet-to-wire to 0.994 to hold formation index through the basis-weight ramp.
Form-and-Press — Nip load reduced 620 → 540 kN/m to protect the lighter web; post-press dryness landed at 47.1%.
Dry-and-Coat — Re-phased the steam schedule across 6 dryer groups and rebalanced the hood; reel moisture converged to 7.4% ±0.19 2σ at 6.1% less steam than the standing recipe.
Defect-and-Inspect — 18 line-scan cameras streaming; two edge-crack precursors detected at the drive side and cleared by a 40 kN/m nip trim before either propagated.
Mill Orchestrator — Speed ramp 1,180 → 1,245 m/min exceeded the site autonomy threshold. Held for the machine tender; approved by J. Okonkwo at 04:57:12.
Quality-and-Conformance — Reel R-24188 released: full genealogy written (furnish, chemistry, CD profiles, defect map, operator actions) and checked against grade spec.
Aggregated pilot results, reconciled against each mill's own baseline [ASPIRATIONAL].
Figures are design targets and pilot-scoped results [ASPIRATIONAL]. Every number is reproduced from the mill's own reel genealogy, not our telemetry.
Every tool invocation, argument and result is written to an immutable, human-readable log — and every reasoning step is expandable. Nothing about a run is hidden from the mill.
Plan → thought → action → observation, exactly as the orchestrator recorded it.
Move PM4 from 135 gsm kraftliner to 110 gsm testliner with zero breaks and under 14 minutes of off-spec production.
Simulate the transition on the twin first. Lead with stock and chemistry so the furnish is right before the basis weight ramps, then trim forming and press, then re-phase drying. Watch the web continuously; hold the speed ramp for a human.
The standing recipe drops basis weight and speed together. On the twin that produces a 3-minute moisture excursion because the dryer section unloads faster than the steam schedule can follow. Sequencing the steam re-phase ahead of the basis-weight ramp removes it.
twin.simulate(candidates=48) → recipe #31 re-phases steam 40 s before the basis-weight ramp and holds nip load until post-press dryness confirms.
Recipe #31 estimates 6.4 t off-spec against 9.8 t for the standing recipe, with break risk 0.07. Two candidates scored lower on steam but raised break risk above the 0.15 site limit and were discarded.
Execute recipe #31 under autonomy level L3: nine setpoint writes permitted, speed ramp routed to the machine tender.
Edge-crack precursor at 1,412 mm drive side at 04:56:41. Nip trim of −40 kN/m in press-2 cleared it in 16 s without a break.
Run complete in 11 m 42 s. 6.2 t off-spec, zero breaks, 6.1% less dryer steam than the standing recipe. Reel R-24188 released with full genealogy.
Four patterns showed up in every engagement.
In every mill, a small number of people could reliably run the hardest transitions — and at least one of them was within five years of retiring.
Break events were recorded but not characterised. Nobody could say which precursor pattern preceded which break.
Every site had an energy or carbon commitment and had already taken the easy reductions.
Reel documentation was assembled manually, late, and inconsistently across shifts.
Same shape at every site.
Half a day on site plus a historian extract. We come back with the wedge that has the shortest payback, in your numbers.
Edge node, QCS/DCS connectors, camera integration, historian backfill. Pulpum writes nothing during this phase.
Agents run against live data and record what they would have done. The crew reviews the record without any obligation to act.
Recommendations appear in the HMI. Acceptance rate becomes the trust metric that gates the next step.
Scoped writes, each approved. The crew sees that the approval gate is real before autonomy widens.
Results against baseline, in writing, with the audit log attached.
A mill does not go from manual to unattended in one step. Pulpum makes the level explicit, auditable and reversible at any time.
| Level | What the agent does | What the human does | Typical time to reach |
|---|---|---|---|
| L1 · Advisory | Recommends setpoints and explains why | Enters every change manually | Week 1 |
| L2 · Supervised | Proposes a write; it executes on approval | Approves each write in the HMI | Week 3–6 |
| L3 · Bounded | Writes inside tag, rate and magnitude limits | Approves ramps and grade releases | Month 2–4 |
| L4 · Unattended | Runs the envelope without prompting | Sets the envelope; reviews the shift record | Month 6+ [ASPIRATIONAL] |
Pulpum reads and writes through the systems already on the floor. No rip-and-replace, no parallel historian, no new HMI to learn.
Valmet IQ, ABB 800xA QCS, Honeywell Experion MX
Profiles, scans, lab results
ABB 800xA, Valmet DNA, Honeywell Experion, Siemens PCS 7
Setpoint reads and guarded writes
WIS/WMS line-scan, IR and transmission cameras
Frames, defect maps, break replays
SAP PP/QM, ABB cpmPlus, custom historians
Orders, grades, reel genealogy
OSIsoft PI, Aspen IP.21, InfluxDB
Time-series backfill and replay
NVIDIA Isaac, winder and wrapper PLCs
Reel, roll and clamp-truck motion
Azure AD, Okta, on-prem LDAP
SSO, RBAC, named approvers
NVIDIA Jetson Orin, IGX, on-prem GPU
Sub-100 ms inference at the machine
Pulpum writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the mill owns.
| Standard | Scope | Status |
|---|---|---|
| SOC 2 Type II | Cloud control plane | RUNNING In progress [ASPIRATIONAL] |
| ISO 27001 | Company-wide ISMS | QUEUED Planned [ASPIRATIONAL] |
| IEC 62443 | Mill-edge OT security | RUNNING Design-aligned |
| GDPR | Operator data | SUCCEEDED Compliant |
| ISO 9001 / FSC | Quality + chain of custody records | SUCCEEDED Supported |
The questions mill managers and process engineers actually ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your site has set. Level 1 is advisory-only: Pulpum recommends and a human enters everything. Most mills spend their first weeks there before enabling supervised writes.
Control returns to the DCS last known-good state within one scan cycle. Pulpum is designed as a supervisory layer on top of your existing control system, never as a replacement for it, so a Pulpum outage degrades the mill to its current way of running — not to a stop.
Break prediction and defect classification typically need 8 to 12 weeks of QCS, DCS and inspection history per grade family, plus labelled break events. Advisory recommendations start in week one from the physics-based twin, and improve as mill-specific history accumulates.
Only if you choose cloud training. Recipes, grade models and defect libraries are tenant-isolated and never used to train another customer's models. A fully on-prem deployment with an air-gapped mill edge is available for sensitive producers.
You are, the same as with any control strategy — which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the reasoning, the limits applied and the human decision.
A 90 to 120 day mill-edge deployment on one paper machine, scoped to a single workflow with a pre-agreed baseline [ASPIRATIONAL]. Weeks 1–3 are connection and shadow-mode observation; weeks 4–8 advisory; weeks 9+ supervised or bounded writes if the mill is satisfied with the recommendations.
We are taking a small number of additional design-partner mills. The programme is a paid 90 to 120 day pilot on one machine with an agreed baseline and a defined exit.
↑↓ navigate↵ openesc close