It reads your mill. It does not replace it.

Pulpum is a supervisory layer. It reads from the QCS, the DCS, the web-inspection system, the historian and the MES you already have, and it writes back through the same interfaces — inside limits you configure.

No new historianNo new HMINo rip and replace

run_8f21c4 · agent graph · PM4 10 nodes · 1 approval gate
01 · orchestrator ingest.grade_target ✓ SUCCEEDED 02 · orchestrator twin.simulate ✓ SUCCEEDED 03 · pulp_stock stock.refine ✓ SUCCEEDED 04 · wetend_chem wetend.dose ✓ SUCCEEDED 05 · form_press form.headbox ✓ SUCCEEDED 06 · form_press press.nip ✓ SUCCEEDED 07 · dry_coat dry.steam ✓ SUCCEEDED 08 · defect_inspect inspect.web ✓ SUCCEEDED 09 · orchestrator approve.human ◆ APPROVAL 10 · quality_conf reel.qualify ✓ SUCCEEDED

Live example: Grade change PM4 · 135 gsm kraftliner → 110 gsm testliner, no break, ≤14 min off-spec

Integrations

It speaks mill, not cloud

Pulpum reads and writes through the systems already on the floor. No rip-and-replace, no parallel historian, no new HMI to learn.

QCS

Valmet IQ, ABB 800xA QCS, Honeywell Experion MX

Profiles, scans, lab results

DCS

ABB 800xA, Valmet DNA, Honeywell Experion, Siemens PCS 7

Setpoint reads and guarded writes

Web inspection

WIS/WMS line-scan, IR and transmission cameras

Frames, defect maps, break replays

Mill MES

SAP PP/QM, ABB cpmPlus, custom historians

Orders, grades, reel genealogy

Historian

OSIsoft PI, Aspen IP.21, InfluxDB

Time-series backfill and replay

Robotics

NVIDIA Isaac, winder and wrapper PLCs

Reel, roll and clamp-truck motion

Identity

Azure AD, Okta, on-prem LDAP

SSO, RBAC, named approvers

Edge

NVIDIA Jetson Orin, IGX, on-prem GPU

Sub-100 ms inference at the machine

See all integrations

Compatibility

Systems and what we do with them

Connector status is stated honestly, including what is not built yet.

Systems and what we do with them
SystemVendor / productDirectionStatus
QCSValmet IQread + profile writeSupported
QCSABB 800xA QCSread + profile writeSupported
QCSHoneywell Experion MXread + profile writeSupported
DCSABB 800xAread + guarded writeSupported
DCSValmet DNAread + guarded writeSupported
DCSHoneywell Experion PKSread + guarded writeSupported
DCSSiemens PCS 7read + guarded writeIn progress [ASPIRATIONAL]
HistorianOSIsoft PIread + backfillSupported
HistorianAspen IP.21read + backfillSupported
Web inspectionWIS / WMS line-scanframes + eventsSupported
MESSAP PP / QMorders + genealogySupported
RoboticsNVIDIA Isaac + winder PLCmotion planningSupported
IdentityAzure AD / Okta / LDAPSSO + SCIMSupported
Run timeline

Where the integrations appear in a run

Every step in this run is a call into a system the mill already owns.

run_8f21c4 PM4 · 6.8 m trim · 1,180 m/min SUCCEEDED
  1. 01 ingest.grade_target SUCCEEDED 0.8 s

    Mill Orchestrator — Pulled the 110 gsm testliner spec, customer tolerances and the standing energy budget from mill MES; locked the target envelope for the run.

  2. 02 twin.simulate SUCCEEDED 34 s

    Mill Orchestrator — Simulated 48 candidate transition recipes on the as-run paper-machine twin — forming, press, dryer and calender — and ranked them on off-spec tonnes, break risk and steam.

  3. 03 stock.refine SUCCEEDED 2 m 10 s

    Pulp-and-Stock — Stepped refiner specific edge load 1.9 → 1.4 Ws/m and pushed freeness toward 412 CSF while consistency held at 3.4%.

  4. 04 wetend.dose SUCCEEDED 1 m 26 s

    Wetend-and-Chemistry — Retention aid trimmed to 214 g/t and sizing to 1.1 kg/t against live charge and turbidity; first-pass retention recovered to 78% inside 90 seconds.

  5. 05 form.headbox SUCCEEDED 1 m 05 s

    Form-and-Press — Re-cut the slice profile across 78 actuators and set jet-to-wire to 0.994 to hold formation index through the basis-weight ramp.

  6. 06 press.nip SUCCEEDED 48 s

    Form-and-Press — Nip load reduced 620 → 540 kN/m to protect the lighter web; post-press dryness landed at 47.1%.

  7. 07 dry.steam SUCCEEDED 3 m 18 s

    Dry-and-Coat — Re-phased the steam schedule across 6 dryer groups and rebalanced the hood; reel moisture converged to 7.4% ±0.19 2σ at 6.1% less steam than the standing recipe.

  8. 08 inspect.web SUCCEEDED continuous

    Defect-and-Inspect — 18 line-scan cameras streaming; two edge-crack precursors detected at the drive side and cleared by a 40 kN/m nip trim before either propagated.

  9. 09 approve.human APPROVAL 52 s

    Mill Orchestrator — Speed ramp 1,180 → 1,245 m/min exceeded the site autonomy threshold. Held for the machine tender; approved by J. Okonkwo at 04:57:12.

  10. 10 reel.qualify SUCCEEDED 1 m 31 s

    Quality-and-Conformance — Reel R-24188 released: full genealogy written (furnish, chemistry, CD profiles, defect map, operator actions) and checked against grade spec.

Tool calls

Integration calls, in the open

mes.read_orders, qcs.read_profile, dcs.write_setpoint — the log names the system every time.

tool-call stream · run_8f21c4
  1. 04:51:04mes.read_orders({ machine: "PM4", next_grade: "TL-110" })
  2. 04:51:04ok spec locked · basis 110 g/m² · moisture 7.4% ±0.5
  3. 04:51:05twin.simulate({ candidates: 48, horizon: "18 min" })
  4. 04:51:39ok best recipe #31 · est. off-spec 6.4 t · break risk 0.07
  5. 04:51:40policy.evaluate({ recipe: 31, autonomy: "L3" })
  6. 04:51:40ok 9 writes permitted · 1 write requires human approval
  7. 04:51:41dcs.write_setpoint({ tag: "REF4.SEL", from: 1.9, to: 1.4 })
  8. 04:53:51ok freeness 388 → 412 CSF · consistency 3.4%
  9. 04:53:52chem.dose({ retention_aid: "214 g/t", sizing: "1.1 kg/t" })
  10. 04:55:18ok first-pass retention 71% → 78%
  11. 04:55:19dcs.slice_profile({ actuators: 78, jet_to_wire: 0.994 })
  12. 04:56:24ok formation index 84 · CD basis 2σ 1.7 g/m²
  13. 04:56:25vision.stream({ cameras: 18, model: "webdefect-v7" })
  14. 04:56:41precursor: edge crack risk 0.62 · drive side · 1,412 mm
  15. 04:56:42dcs.nip_load({ delta: "-40 kN/m", zone: "press-2" })
  16. 04:56:58ok edge crack risk 0.62 → 0.09 · web stable
  17. 04:56:59approval.request({ action: "speed_ramp", to: "1245 m/min" })
  18. 04:57:12ok approved by J. Okonkwo (machine tender) · logged
  19. 04:58:44mes.log_reel({ reel: "R-24188", genealogy: "full" })
  20. 05:02:46ok run complete · 11m42s · off-spec 6.2 t · breaks 0

Reasoning trace

Plan → thought → action → observation, exactly as the orchestrator recorded it.

GoalMove PM4 from 135 gsm kraftliner to 110 gsm testliner with zer…

Move PM4 from 135 gsm kraftliner to 110 gsm testliner with zero breaks and under 14 minutes of off-spec production.

PlanSimulate the transition on the twin first. Lead with stock and…

Simulate the transition on the twin first. Lead with stock and chemistry so the furnish is right before the basis weight ramps, then trim forming and press, then re-phase drying. Watch the web continuously; hold the speed ramp for a human.

ThoughtThe standing recipe drops basis weight and speed together. On …

The standing recipe drops basis weight and speed together. On the twin that produces a 3-minute moisture excursion because the dryer section unloads faster than the steam schedule can follow. Sequencing the steam re-phase ahead of the basis-weight ramp removes it.

Actiontwin.simulate(candidates=48) → recipe #31 re-phases steam 40 s…

twin.simulate(candidates=48) → recipe #31 re-phases steam 40 s before the basis-weight ramp and holds nip load until post-press dryness confirms.

ObservationRecipe #31 estimates 6.4 t off-spec against 9.8 t for the stan…

Recipe #31 estimates 6.4 t off-spec against 9.8 t for the standing recipe, with break risk 0.07. Two candidates scored lower on steam but raised break risk above the 0.15 site limit and were discarded.

ActionExecute recipe #31 under autonomy level L3: nine setpoint writ…

Execute recipe #31 under autonomy level L3: nine setpoint writes permitted, speed ramp routed to the machine tender.

ObservationEdge-crack precursor at 1,412 mm drive side at 04:56:41. Nip t…

Edge-crack precursor at 1,412 mm drive side at 04:56:41. Nip trim of −40 kN/m in press-2 cleared it in 16 s without a break.

OutcomeRun complete in 11 m 42 s. 6.2 t off-spec, zero breaks, 6.1% l…

Run complete in 11 m 42 s. 6.2 t off-spec, zero breaks, 6.1% less dryer steam than the standing recipe. Reel R-24188 released with full genealogy.

Connection

How a mill gets connected

Three to four weeks from rack to shadow mode, assuming network access is available.

  1. Network segmentation

    The edge node sits in the OT network with a defined, minimal path to the control plane. Firewall rules are documented before installation.

  2. Tag mapping

    Tags are mapped and validated against the machine tag database. Every tag Pulpum may write is explicitly listed and reviewed with the automation engineer.

  3. Scan alignment

    QCS scans, DCS samples and camera frames are aligned to reel position, so a defect at 1,412 mm is traceable to the chemistry that caused it.

  1. Historian backfill

    Twelve or more weeks of history are backfilled so models can be trained and baselines established from your data.

  2. Camera integration

    Line-scan cameras are synchronised and calibrated; existing web-inspection systems can be used as a source instead of new hardware where suitable.

  3. Validation

    Shadow mode runs until the mill agrees the readings and recommendations match what the crew sees on the machine.

Boundaries

What Pulpum deliberately does not do

A clear boundary is what makes a supervisory layer safe to install on a machine that is already running.

Out of scope by design

  • Replacing base-layer regulatory control
  • Replacing the QCS scanner or its profile control hardware
  • Acting as the mill's system of record for orders or inventory
  • Providing the primary operator HMI
  • Safety-instrumented functions and interlocks
  • Anything that cannot be reverted by a human in one action
Accelerated computing

Physical AI, at the machine

Paper moves at 1,200 metres a minute. Perception has to be local, deterministic and fast, so Pulpum runs GPU inference at the mill edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

8–24 synchronised line-scan cameras per machine. Sub-100 ms defect classification, sub-250 ms break-risk updates. [ASPIRATIONAL design targets]

Triton · NIM

Model serving

Vision, time-series prognostics, grade embeddings and process reasoning behind one orchestrator, with deterministic rollback by model version.

DGX / HGX · NeMo

Training

Defect vision, break precursors, wet-end response and drying models trained on reel genealogy, QCS histories and operator corrections.

Omniverse · OVX

Digital twin

GPU-accelerated CFD, drying and web-dynamics simulation of the as-run machine — 10–100 candidate recipes evaluated per grade change.

Omniverse Replicator · Cosmos

Synthetic data

Rare break, contamination, wrinkle and formation-upset variants generated and always validated against real mill events before promotion.

cuOpt

Optimisation

Grade-change sequencing, dryer energy allocation, machine-speed balancing and maintenance windows under production and energy constraints.

Autonomy

Four levels, set per agent and per tag

A mill does not go from manual to unattended in one step. Pulpum makes the level explicit, auditable and reversible at any time.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesTypical time to reach
L1 · AdvisoryRecommends setpoints and explains whyEnters every change manuallyWeek 1
L2 · SupervisedProposes a write; it executes on approvalApproves each write in the HMIWeek 3–6
L3 · BoundedWrites inside tag, rate and magnitude limitsApproves ramps and grade releasesMonth 2–4
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordMonth 6+ [ASPIRATIONAL]
Guardrails

An agent that can move a nip needs a leash

Pulpum writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the mill owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, inside per-tag rate and magnitude limits.
  • Policy engine before every write. Autonomy level, shift, grade, interlock state and operator presence are all evaluated before a setpoint moves.
  • Human-in-the-loop gates. Anything above the site threshold — speed ramps, grade releases, safety-adjacent moves — waits for a named approver.
  • Immutable audit log. Append-only, hash-chained, exportable, and retained on the mill's own storage.
  • Hard fallback. Loss of the edge node, the network or the model returns control to the DCS's last known-good state within one scan cycle.
  • Tenant and IP isolation. Furnish recipes, grade models and defect libraries never cross a customer boundary. On-prem deployment available.

Compliance posture

Compliance and certification status
StandardScopeStatus
SOC 2 Type IICloud control plane RUNNING In progress [ASPIRATIONAL]
ISO 27001Company-wide ISMS QUEUED Planned [ASPIRATIONAL]
IEC 62443Mill-edge OT security RUNNING Design-aligned
GDPROperator data SUCCEEDED Compliant
ISO 9001 / FSCQuality + chain of custody records SUCCEEDED Supported

Read the security overview

From the control room

What machine tenders say

Autonomy earns trust one shift at a time. These are design-partner quotes from pilot deployments [ASPIRATIONAL].

"The first thing that convinced the crew wasn't the control — it was the log. You can scroll back and see exactly why it dropped the nip. Nobody argues with a timestamp."

Machine tender · PM4 · Nordkraft Mills

"We had two people who could do a clean 135-to-110 transition. One retired in March. The twin now does the sequencing and the second one supervises it."

Production manager · Aurora Board

"Break prediction was the wedge. Ninety seconds of warning is the difference between a nip trim and four hours of threading."

Process engineer · Ternvik Paper
FAQ

Straight answers

The questions mill managers and process engineers actually ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your site has set. Level 1 is advisory-only: Pulpum recommends and a human enters everything. Most mills spend their first weeks there before enabling supervised writes.